
OpenAlex is a bibliographic catalogue of scientific papers, authors and institutions accessible in open access mode, named after the Library of Alexandria. It's citation coverage is excellent and I hope you will find utility in this listing of citing articles!
If you click the article title, you'll navigate to the article, as listed in CrossRef. If you click the Open Access links, you'll navigate to the "best Open Access location". Clicking the citation count will open this listing for that article. Lastly at the bottom of the page, you'll find basic pagination options.
Requested Article:
Study the delays and conflicts for construction projects and their mutual relationship: A review
Junaid Tariq, Syed Shujaa Safdar Gardezi
Ain Shams Engineering Journal (2022) Vol. 14, Iss. 1, pp. 101815-101815
Open Access | Times Cited: 59
Junaid Tariq, Syed Shujaa Safdar Gardezi
Ain Shams Engineering Journal (2022) Vol. 14, Iss. 1, pp. 101815-101815
Open Access | Times Cited: 59
Showing 26-50 of 59 citing articles:
Confirmatory factor analysis of the positive factors influencing the performance of Ghanaian construction projects
Benjamin Boahene Akomah, Prasanna Venkatesan Ramani
Construction Innovation (2024)
Closed Access | Times Cited: 1
Benjamin Boahene Akomah, Prasanna Venkatesan Ramani
Construction Innovation (2024)
Closed Access | Times Cited: 1
Moment balanced machine: a new supervised inference engine for on-site construction productivity prediction
Min‐Yuan Cheng, Riqi Radian Khasani
Applied Intelligence (2024) Vol. 54, Iss. 7, pp. 5441-5464
Closed Access | Times Cited: 1
Min‐Yuan Cheng, Riqi Radian Khasani
Applied Intelligence (2024) Vol. 54, Iss. 7, pp. 5441-5464
Closed Access | Times Cited: 1
Strength Prediction of Concrete with Cold Joints Using Artificial Neural Network and Sensitivity Analysis
Jomar M. Llanto, Dario Landa-Silva, Christ John L. Marcos
(2024) Vol. 8, pp. 98-103
Closed Access | Times Cited: 1
Jomar M. Llanto, Dario Landa-Silva, Christ John L. Marcos
(2024) Vol. 8, pp. 98-103
Closed Access | Times Cited: 1
Modelling the impacts of security on construction delays: A case of Afghanistan
Mohammad Basheer Ahmadzai, Kunhui Ye
Heliyon (2024) Vol. 10, Iss. 12, pp. e32662-e32662
Open Access | Times Cited: 1
Mohammad Basheer Ahmadzai, Kunhui Ye
Heliyon (2024) Vol. 10, Iss. 12, pp. e32662-e32662
Open Access | Times Cited: 1
Critical Project Impact Factors for Federal Capital Facility Projects
Vivek Sharma, Prajakta Bapat, Stuti Garg, et al.
Journal of Construction Engineering and Management (2024) Vol. 150, Iss. 10
Closed Access | Times Cited: 1
Vivek Sharma, Prajakta Bapat, Stuti Garg, et al.
Journal of Construction Engineering and Management (2024) Vol. 150, Iss. 10
Closed Access | Times Cited: 1
A systematic search and review of early contractor involvement in construction project development
Innocent Chigozie Osuizugbo, Mazen M. Omer, Rahimi A. Rahman, et al.
Built Environment Project and Asset Management (2024) Vol. 14, Iss. 6, pp. 835-857
Closed Access | Times Cited: 1
Innocent Chigozie Osuizugbo, Mazen M. Omer, Rahimi A. Rahman, et al.
Built Environment Project and Asset Management (2024) Vol. 14, Iss. 6, pp. 835-857
Closed Access | Times Cited: 1
Critical success criteria for construction projects: a systematic literature evaluation
Neda Kiani Mavi, Kerry Brown, Richard Fulford, et al.
Engineering Construction & Architectural Management (2024)
Closed Access | Times Cited: 1
Neda Kiani Mavi, Kerry Brown, Richard Fulford, et al.
Engineering Construction & Architectural Management (2024)
Closed Access | Times Cited: 1
Effective Management of Multi-Cultural Construction Project Teams Issues and Strategies for Improving Team Performance
Sahan Nishok Purasinghe
International Journal of Innovative Science and Research Technology (IJISRT) (2024), pp. 2711-2719
Open Access | Times Cited: 1
Sahan Nishok Purasinghe
International Journal of Innovative Science and Research Technology (IJISRT) (2024), pp. 2711-2719
Open Access | Times Cited: 1
IMPROVING CONSTRUCTION PROJECTS AND REDUCING RISK BY USING ARTIFICIAL INTELLIGENCE
Milena Senjak Pejić, Mirjana Terzić, Dragana Stanojević, et al.
Social informatics journal (2023) Vol. 2, Iss. 1, pp. 33-40
Open Access | Times Cited: 3
Milena Senjak Pejić, Mirjana Terzić, Dragana Stanojević, et al.
Social informatics journal (2023) Vol. 2, Iss. 1, pp. 33-40
Open Access | Times Cited: 3
Job attributes of key Sri Lankan construction professionals in addressing the challenges associated with climate change
Iddamalgoda Pathiranage Tharindu Sandaruwan, J.A.B. Janardana, Kesavan Manoharan
International Journal of Disaster Resilience in the Built Environment (2023) Vol. 15, Iss. 3, pp. 370-394
Closed Access | Times Cited: 2
Iddamalgoda Pathiranage Tharindu Sandaruwan, J.A.B. Janardana, Kesavan Manoharan
International Journal of Disaster Resilience in the Built Environment (2023) Vol. 15, Iss. 3, pp. 370-394
Closed Access | Times Cited: 2
Identifying Causes of Claims in The Egyptian Construction Sector
Hatem Shaker Elbehairy, Alsayed Mohamed Nagy
Journal of Advanced Research in Applied Sciences and Engineering Technology (2023) Vol. 35, Iss. 2, pp. 132-143
Open Access | Times Cited: 2
Hatem Shaker Elbehairy, Alsayed Mohamed Nagy
Journal of Advanced Research in Applied Sciences and Engineering Technology (2023) Vol. 35, Iss. 2, pp. 132-143
Open Access | Times Cited: 2
Identifying Communication Issues and Its Impact on the Efficiency of Construction
A. Arjun Krishna
Lecture notes in civil engineering (2023), pp. 157-173
Closed Access | Times Cited: 1
A. Arjun Krishna
Lecture notes in civil engineering (2023), pp. 157-173
Closed Access | Times Cited: 1
Performance management in construction projects: a systematic literature review
Humberto Rafael Zuleta-Castellano, Alfredo Enrique Sanabria-Ospino, Fabio Andrés Puerta Guardo, et al.
DYNA (2023) Vol. 90, Iss. 228, pp. 55-65
Open Access | Times Cited: 1
Humberto Rafael Zuleta-Castellano, Alfredo Enrique Sanabria-Ospino, Fabio Andrés Puerta Guardo, et al.
DYNA (2023) Vol. 90, Iss. 228, pp. 55-65
Open Access | Times Cited: 1
Assessment of the Factors Influencing Delays on Construction Projects in Mogadishu Somalia
Abdiweli Ali Farah, Yasir Hassan Osman, Faizo Ahmed Mohamud, et al.
(2023), pp. 1-6
Closed Access | Times Cited: 1
Abdiweli Ali Farah, Yasir Hassan Osman, Faizo Ahmed Mohamud, et al.
(2023), pp. 1-6
Closed Access | Times Cited: 1
Losses Resulting from Exceeding the Specified Time for Completion and Its Impact on the Status of the Project and Delay in Utilizing Services
Abdulrahman Al-Mafrachi, Sepanta Naimi
Mathematical Modelling and Engineering Problems (2024) Vol. 11, Iss. 2, pp. 404-412
Open Access
Abdulrahman Al-Mafrachi, Sepanta Naimi
Mathematical Modelling and Engineering Problems (2024) Vol. 11, Iss. 2, pp. 404-412
Open Access
Performance barriers and competence development of graduate architects in construction contract administration (CCA): the mediating role of CCA skills
Tiew Si Yee
Engineering Construction & Architectural Management (2024)
Closed Access
Tiew Si Yee
Engineering Construction & Architectural Management (2024)
Closed Access
Estrategias de mejora del desempeño del cronograma en proyectos de construcción
NOVASINERGIA REVISTA DIGITAL DE CIENCIA INGENIERÍA Y TECNOLOGÍA (2024) Vol. 7, Iss. 2, pp. 164-182
Open Access
NOVASINERGIA REVISTA DIGITAL DE CIENCIA INGENIERÍA Y TECNOLOGÍA (2024) Vol. 7, Iss. 2, pp. 164-182
Open Access
A 4-Dimensional Strategy for Managing Construction Waste Originating during the Design Process within Architectural Design Firms in Egypt
Ayman Ahmed Ezzat Othman, Aya Said Muawad Saad
International journal of engineering research in Africa (2024) Vol. 70, pp. 95-116
Closed Access
Ayman Ahmed Ezzat Othman, Aya Said Muawad Saad
International journal of engineering research in Africa (2024) Vol. 70, pp. 95-116
Closed Access
MANAGERIAL COMPETENCIES AS A BAROMETER FROM CONSTRUCTION PROJECT MANAGERS’S PERSPECTIVE
Nurhayatul Khursniah Hasim, Hafez Salleh
PLANNING MALAYSIA (2024) Vol. 22
Open Access
Nurhayatul Khursniah Hasim, Hafez Salleh
PLANNING MALAYSIA (2024) Vol. 22
Open Access
ANALYSIS OF THE CONTRACTUAL CAUSES OF CONFLICTS IN EGYPTION CONSTRUCTION PROJECTS.
Essam Abou-ElFetouh, Mohamed Abdel-Hamid, Said Hasanin
Journal of Al-Azhar University Engineering Sector (2024), pp. 86-101
Open Access
Essam Abou-ElFetouh, Mohamed Abdel-Hamid, Said Hasanin
Journal of Al-Azhar University Engineering Sector (2024), pp. 86-101
Open Access
Analyzing the critical delay factors for construction projects in the public sector using relative importance index and machine learning techniques
Sirinthip Ouansrimeang, Kittipol Wisaeang
Journal of Infrastructure Policy and Development (2024) Vol. 8, Iss. 8, pp. 6208-6208
Open Access
Sirinthip Ouansrimeang, Kittipol Wisaeang
Journal of Infrastructure Policy and Development (2024) Vol. 8, Iss. 8, pp. 6208-6208
Open Access
Causes of troubled and delayed construction projects in Iraq: University buildings as a case study
Hanan Abdul Munem Rajab, Hatem Khaleefah Breesam
AIP conference proceedings (2024) Vol. 3203, pp. 050088-050088
Closed Access
Hanan Abdul Munem Rajab, Hatem Khaleefah Breesam
AIP conference proceedings (2024) Vol. 3203, pp. 050088-050088
Closed Access
Enhancing Performance in Construction Project Management Teams
Sahan Nishok Purasinghe
International Journal of Innovative Science and Research Technology (IJISRT) (2024), pp. 809-818
Open Access
Sahan Nishok Purasinghe
International Journal of Innovative Science and Research Technology (IJISRT) (2024), pp. 809-818
Open Access
Determining the Root Causes of Project Delay: A Case Study
Sapizah Rahim, Mohd Hafiz Bin Zulfakar, Rumaizah Binti Ruslan
Information Management and Business Review (2024) Vol. 16, Iss. 3S(I)a, pp. 39-45
Closed Access
Sapizah Rahim, Mohd Hafiz Bin Zulfakar, Rumaizah Binti Ruslan
Information Management and Business Review (2024) Vol. 16, Iss. 3S(I)a, pp. 39-45
Closed Access
Framework for Avoidance of Disputes Arising in the Construction Industry due to the Economic Crisis
A. Rajapaksha, B.A.K.S. Perera, T. N. Liyanawatta
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction (2024) Vol. 17, Iss. 1
Closed Access
A. Rajapaksha, B.A.K.S. Perera, T. N. Liyanawatta
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction (2024) Vol. 17, Iss. 1
Closed Access