
OpenAlex is a bibliographic catalogue of scientific papers, authors and institutions accessible in open access mode, named after the Library of Alexandria. It's citation coverage is excellent and I hope you will find utility in this listing of citing articles!
If you click the article title, you'll navigate to the article, as listed in CrossRef. If you click the Open Access links, you'll navigate to the "best Open Access location". Clicking the citation count will open this listing for that article. Lastly at the bottom of the page, you'll find basic pagination options.
Requested Article:
A Review on Significant Factors Causing Delays in Saudi Arabia Construction Projects
Abdulali Mohammed Alajmi, Zubair Ahmed Memon
Smart Cities (2022) Vol. 5, Iss. 4, pp. 1465-1487
Open Access | Times Cited: 23
Abdulali Mohammed Alajmi, Zubair Ahmed Memon
Smart Cities (2022) Vol. 5, Iss. 4, pp. 1465-1487
Open Access | Times Cited: 23
Showing 23 citing articles:
Digitalization and Smartification of Urban Services to Enhance Urban Resilience in the Post-Pandemic Era: The Case of the Pilgrimage City of Makkah
Yusuf A. Aina, Ismaila Rimi Abubakar, Abdulaziz I. Almulhim, et al.
Smart Cities (2023) Vol. 6, Iss. 4, pp. 1973-1995
Open Access | Times Cited: 16
Yusuf A. Aina, Ismaila Rimi Abubakar, Abdulaziz I. Almulhim, et al.
Smart Cities (2023) Vol. 6, Iss. 4, pp. 1973-1995
Open Access | Times Cited: 16
Investigation on Factors Contributing to Public Project Delays in Kota Kinabalu Based on Human Errors Using the RII Method: A Pilot Study
Nazaruddin Abdul Taha, Hazwani Halid, Siti Jahara Matlan, et al.
(2025), pp. 209-227
Closed Access
Nazaruddin Abdul Taha, Hazwani Halid, Siti Jahara Matlan, et al.
(2025), pp. 209-227
Closed Access
Exploring risk factors causing delays in mega project in Gulf region: an industrial qualitative approach
Mahmoud Mohamed Nasr Abdou Elshamy, Faris Elghaish, Tara Brooks
Smart and Sustainable Built Environment (2025)
Closed Access
Mahmoud Mohamed Nasr Abdou Elshamy, Faris Elghaish, Tara Brooks
Smart and Sustainable Built Environment (2025)
Closed Access
A Systematic Multi-Criteria Quantitative Model for Evaluating the Change Order Impact on Contractors’ Cash Flow
Altayeb Qasem
Buildings (2025) Vol. 15, Iss. 8, pp. 1246-1246
Open Access
Altayeb Qasem
Buildings (2025) Vol. 15, Iss. 8, pp. 1246-1246
Open Access
Bridging the Literature Gap on eProcurement Systems: Insights from Saudi Arabia’s Sustainable Development Transition
Basel Sultan, Ibrahim Al-Hammad, Alanoud Alothman, et al.
Sustainability (2025) Vol. 17, Iss. 8, pp. 3429-3429
Open Access
Basel Sultan, Ibrahim Al-Hammad, Alanoud Alothman, et al.
Sustainability (2025) Vol. 17, Iss. 8, pp. 3429-3429
Open Access
BIM Impact on Construction Project Time Using System Dynamics in Saudi Arabia’s Construction
Aljawharah A. Alnaser, Naif M. Alsanabani, Khalid S. Al-Gahtani
Buildings (2023) Vol. 13, Iss. 9, pp. 2267-2267
Open Access | Times Cited: 9
Aljawharah A. Alnaser, Naif M. Alsanabani, Khalid S. Al-Gahtani
Buildings (2023) Vol. 13, Iss. 9, pp. 2267-2267
Open Access | Times Cited: 9
Development of a Performance Assessment Model for Contractors in Saudi Arabian Construction Projects
Ghasan Alfalah, Saad Aldajani, Nehal Elshaboury, et al.
Advances in Civil Engineering (2024) Vol. 2024, pp. 1-17
Open Access | Times Cited: 3
Ghasan Alfalah, Saad Aldajani, Nehal Elshaboury, et al.
Advances in Civil Engineering (2024) Vol. 2024, pp. 1-17
Open Access | Times Cited: 3
An Investigation into the Causes of Payment Delays and Deliberate Delay Tactics in Public Construction Projects in Saudi Arabia
Abdulrahman S. Bageis
Buildings (2024) Vol. 14, Iss. 6, pp. 1792-1792
Open Access | Times Cited: 3
Abdulrahman S. Bageis
Buildings (2024) Vol. 14, Iss. 6, pp. 1792-1792
Open Access | Times Cited: 3
An extensive examination of the barriers faced by contractors leading to project delays
Mohamed M. Abo El-Wafa, Ibrahim Mosly
Global Journal of Engineering and Technology Advances (2024) Vol. 18, Iss. 3, pp. 152-167
Open Access | Times Cited: 2
Mohamed M. Abo El-Wafa, Ibrahim Mosly
Global Journal of Engineering and Technology Advances (2024) Vol. 18, Iss. 3, pp. 152-167
Open Access | Times Cited: 2
Main Delay Factors of Implementation EPC Construction Projects in Iraq
Noor Hussein Khairullah, Mustafa A. Hilal, Abbas M. Burhan
Journal of Engineering (2023) Vol. 29, Iss. 10, pp. 195-207
Open Access | Times Cited: 5
Noor Hussein Khairullah, Mustafa A. Hilal, Abbas M. Burhan
Journal of Engineering (2023) Vol. 29, Iss. 10, pp. 195-207
Open Access | Times Cited: 5
Critical Risk Factors influencing Time Schedule of Residential Projects in Pakistan
Samiullah Sohu, Tahara Ramadzan Binti Md. Kassim, Omar Shahid Khan
Engineering Technology & Applied Science Research (2024) Vol. 14, Iss. 1, pp. 12636-12639
Open Access | Times Cited: 1
Samiullah Sohu, Tahara Ramadzan Binti Md. Kassim, Omar Shahid Khan
Engineering Technology & Applied Science Research (2024) Vol. 14, Iss. 1, pp. 12636-12639
Open Access | Times Cited: 1
Study of risks in high rise building projects in India and the mitigation measures
Vaishali Sahu, Kashi Nath Sharma
Asian Journal of Civil Engineering (2023) Vol. 24, Iss. 7, pp. 1957-1967
Closed Access | Times Cited: 2
Vaishali Sahu, Kashi Nath Sharma
Asian Journal of Civil Engineering (2023) Vol. 24, Iss. 7, pp. 1957-1967
Closed Access | Times Cited: 2
Adequate Budgetary Allocation and Infrastructural Projects Implementation in Shenzhen City Projects, China
Yang He, Wei Dongming Alajmi, Cai Weihua Mustafa
Journal of Entrepreneurship & Project Management (2023) Vol. 7, Iss. 5, pp. 12-20
Open Access | Times Cited: 2
Yang He, Wei Dongming Alajmi, Cai Weihua Mustafa
Journal of Entrepreneurship & Project Management (2023) Vol. 7, Iss. 5, pp. 12-20
Open Access | Times Cited: 2
THE MODERATING EFFECTS OF STATUTORY LAWS AND REGULATIONS OF RISK FACTORS AND MANAGEMENT IN THE KINGDOM OF SAUDI ARABIA CONSTRUCTION INDUSTRIES
Muhammad Abdul Rehman, Md Sayuti Bin Ishak, A. Q. Adeleke
Business Management and Economics Engineering (2024) Vol. 22, Iss. 01, pp. 53-76
Open Access
Muhammad Abdul Rehman, Md Sayuti Bin Ishak, A. Q. Adeleke
Business Management and Economics Engineering (2024) Vol. 22, Iss. 01, pp. 53-76
Open Access
Influential Time and Cost Factors for Commercial Projects in the Malaysian Construction Industry
Samiullah Sohu, Tahara Ramadzan, Omar Shahid Khan, et al.
Engineering Technology & Applied Science Research (2024) Vol. 14, Iss. 3, pp. 14170-14174
Open Access
Samiullah Sohu, Tahara Ramadzan, Omar Shahid Khan, et al.
Engineering Technology & Applied Science Research (2024) Vol. 14, Iss. 3, pp. 14170-14174
Open Access
Application of Artificial Intelligence Technology in Intelligent Building Decoration Management
Jianqiang Gan
(2024), pp. 1-5
Closed Access
Jianqiang Gan
(2024), pp. 1-5
Closed Access
Unsupervised machine learning for identifying key risk factors contributing to construction delays
Fuad Al-Bataineh, Ahmed Ali Khatatbeh, Yazan Alzubi
Organization Technology and Management in Construction An International Journal (2024) Vol. 16, Iss. 1, pp. 170-185
Open Access
Fuad Al-Bataineh, Ahmed Ali Khatatbeh, Yazan Alzubi
Organization Technology and Management in Construction An International Journal (2024) Vol. 16, Iss. 1, pp. 170-185
Open Access
Factors Affecting Contract Compliance and Execution of Public Works in the Executing Unit: Special Project Huallaga Central and Bajo Mayo in Peru, 2022
Anjhinson Romero, Doris Esenarro
Buildings (2024) Vol. 14, Iss. 9, pp. 2664-2664
Open Access
Anjhinson Romero, Doris Esenarro
Buildings (2024) Vol. 14, Iss. 9, pp. 2664-2664
Open Access
Legal framework governing consumers’ protection in digital banking in Saudi Arabia
Sara Abdulhameed Aljudaibi, Yusuff Jelili Amuda
Journal of Infrastructure Policy and Development (2024) Vol. 8, Iss. 8, pp. 5453-5453
Open Access
Sara Abdulhameed Aljudaibi, Yusuff Jelili Amuda
Journal of Infrastructure Policy and Development (2024) Vol. 8, Iss. 8, pp. 5453-5453
Open Access
From Delay to Delivery - a Strategic Approach to Improving Project Performance in Madinah, Saudi Arabia
P AHMED, A Yazeed
(2024)
Closed Access
P AHMED, A Yazeed
(2024)
Closed Access
From Delay to Delivery - a Strategic Approach to Improving Project Performance in Madinah, Saudi Arabia
P AHMED, A Yazeed
(2024)
Closed Access
P AHMED, A Yazeed
(2024)
Closed Access
Building Information Modeling Impact on Cost Overrun Risk Factors and Interrelationships
Aljawharah A. Alnaser, Khalid S. Al-Gahtani, Naif M. Alsanabani
Applied Sciences (2024) Vol. 14, Iss. 22, pp. 10711-10711
Open Access
Aljawharah A. Alnaser, Khalid S. Al-Gahtani, Naif M. Alsanabani
Applied Sciences (2024) Vol. 14, Iss. 22, pp. 10711-10711
Open Access
A virtual reality-based constructability index for construction projects
Altayeb Qasem, Abdulaziz S. Almohassen
Construction Innovation (2023) Vol. 25, Iss. 2, pp. 442-460
Closed Access
Altayeb Qasem, Abdulaziz S. Almohassen
Construction Innovation (2023) Vol. 25, Iss. 2, pp. 442-460
Closed Access